Constructed project
85 m²
Project. Outfitting services. Supervision

Country house spa complex

Category
Area
Status

SPA COMPLEX RENOVATION

Context
New function for an existing building
/01
Our bureau carried out a project of landscaping of the area adjacent to a private house. And one of the project tasks was the reconstruction of an existing building, which was supposed to be used as a SPA complex.
Stylistic solutions were already established in the main residential house, which was received from our colleagues. We just tried to make it a bit more modern by using stained glass windows, passing to the roof in the indoor pool area.
In additional to modernizing the shape, this allowed sunlight to illuminate the interior more attractively, and allowed the exterior to penetrate the interior space almost seamlessly.
Formation of rooms
/02
The new extension part of the building was entirely devoted to the swimming pool. The existing one was redesigned as a recreation area with a bathroom, a hammam and a shower. Initially, the room had a classical shape. Radius corners were designed to make the space more welcoming and cozy.
We didn’t want to put the shower behind the door. So we made a spiral to create visual privacy, without using the door, and also to organize the traffic flow. It is worth paying attention to the connection between the porcelain stoneware and the mosaic.
solution

When we were thinking about a hamam, in spite of ergonomics, we were very much concerned about shaping. All the masters we knew offered +- the same scheme for organizing the frame. All of this was crowned with the use of GKLV, with all the consequences. Then we decided to use a robotic arm for milling PSB-50 into the desired form smoothness.

We got a LEGO that remained to be assembled inside the space, installing communications, reinforcing with mesh and waterproofing before laying the mosaic. Styrofoam is an excellent thermal insulator, the speed of erection of such a structure, given the fluid shapes and complex joints, the speed of construction was high.

And the final result with the help of GKLV certainly could not be achieved. Among other things, as part of the author's supervision, we helped the executors in complex nodes, having previously prepared a 3D model and tested everything on it.